GUIDE
The kill is the part everybody plans. What decides whether the meat reaches the buyer at the right temperature happens afterwards: cooling, loading, the drive, and the rules on how far a farm may sell.

Build the chain as four handovers: chiller to loading bay, loading bay to vehicle, vehicle to customer, customer to display. Every handover loses temperature and needs a record.
Two rules settle most of it. The meat leaves the chiller at the temperature the buyer requires, commonly 0-4 °C for chilled carcass, so the vehicle holds temperature rather than recovering it. And the vehicle is pre-cooled and empty before the first carcass arrives. Freezing is separate: a chill room is not a blast freezer, so plan freezing capacity at the plant or a cold store.
For farm-direct distribution inside one shift, the choice is an insulated box body with a refrigeration unit, or a refrigerated van around the same box. Both hold 0-4 °C. They differ in duty cycle, loading height, and behaviour when the unit fails on the road.
Size the body in carcass-equivalents: 1.0 m³ per cattle carcass and 0.35 m³ per lamb, with about 70% of nominal body volume left for airflow and pallets.
| Nominal body volume | Usable at about 70% | Cattle carcasses | Lamb carcasses |
|---|---|---|---|
| 8 m³ | 5.6 m³ | about 5 | about 16 |
| 12 m³ | 8.4 m³ | about 8 | about 24 |
| 16 m³ | 11.2 m³ | about 11 | about 32 |
Three details decide whether that number is real. The door opening must pass a hung carcass without tilting it. The box needs a drain and a wash point on a mixed route. The loading floor should sit near the kill floor, so nobody lifts a carcass twice. Ask for the duty rating and the behaviour after a compressor fault: that decides whether you need a second vehicle or a written backup plan.
Direct selling compresses into a window: kill in the morning, chill, load, drive, sell, return. A 150 km round trip is roughly 2.5-3 h of driving, leaving three to five hours for loading, selling and paperwork. Three or four drops fit inside that window only if each drop is pre-ordered, paid for and counted before loading.
Build the route from four numbers: driving time both ways, loading time per drop, carcasses per drop, and the last time the final customer can be reached. Then convert driving time into kilometres on real roads: a farm track at 20 km/h is not a highway at 80 km/h, and that decides how many customers one shift carries. The radius that falls out of that arithmetic is usually shorter than the one in the sales conversation; when it is too tight to be worth the trip the answer is not a bigger body but a fixed plant closer to the animals.
Rules on selling farm-killed meat differ by country, region and customer type. Do not read them from a supplier's summary. Ask the competent authority three questions in writing before the unit is ordered:
The answers size the cold chain. If direct sale is limited, the vehicle is planned around wholesale drops. If a temperature record per trip is required, the unit needs a logger with a download port. If only local buyers may be served, the cold chain is short and the unit is sized accordingly.
Do not compare cold chains on vehicle price. The number that matters is the cost per head delivered: fuel, running cost per kilometre, crew hours per shift and refrigeration running time, divided by the carcasses actually delivered, not by the body capacity.
Utilisation turns a good vehicle into a cheap one. A body that returns half empty on three of five stops carries fixed costs across fewer carcasses, so compare a larger body with fewer stops against a smaller body with more. The arithmetic usually rewards fewer stops: every extra stop adds a door opening, a temperature check and a docking delay.
| Question | What to fix before the deposit |
|---|---|
| Export and operating approval | HS code and declaration of conformity for the body and the refrigeration unit, and whether your market treats the unit as a machine, a road vehicle or a food premises |
| Certification, voltage and plug | Engine-driven or electric unit; for an electric unit the phase, voltage and frequency of your grid, plus type approval the chassis and unit need |
| Loading and lead time | Whether the body ships separately from the chassis, on a flat rack or in a container, with build weeks and sailing weeks quoted separately |
| Spare parts and after-sales | Wear parts with part numbers, door gaskets, temperature probes, matched refrigerant, wiring diagrams, a first-year spares kit and a named contact with a response time |
One technical point closes the electrical question: a unit built for 50 Hz is not interchangeable with one designed for 60 Hz, and a three-phase 380 V compressor needs a three-phase supply many farm yards do not have. Both belong in the order.
HUAYI EQUIPMENT builds mobile slaughter units in China. Send your species mix, peak head count per week, customer distance, grid supply and destination country and port, and we will return a cold chain configuration you can check against the numbers above.