GUIDE
Whether you are building a fixed small abattoir or specifying a mobile slaughtering trailer, the layout decides throughput, hygiene compliance and how hard your staff have to work. Here is the sequence that works.
Everything else follows from heads per day. A unit handling 10 head per day is a different building from one handling 60, even though both are called "small".
| Throughput | Floor area guide | Typical configuration |
|---|---|---|
| 5–10 head/day | 60–100 m² | Single line, shared chilling |
| 10–30 head/day | 120–200 m² | Separate kill and cutting rooms |
| 30–60 head/day | 250–400 m² | Dedicated lairage, two chilling rooms |
Add space for lairage, waste, staff changing and a wash-down bay. These are the areas most often squeezed out in planning and most often cited in inspections.
The single rule that drives the whole plan: animals and dirty operations must never cross the path of clean carcass and meat. In practice that means:
If your building forces a two-way corridor, the compliant answer is usually a wall and a second door, not a procedure.
Lairage. Size for one day's kill plus a buffer. Provide water, non-slip floor, and drainage. Shade or roof in hot climates.
Stunning and bleeding. Immediately adjacent to lairage, separated from the clean side. Blood must drain to a dedicated collection point.
Dressing line. Allow 4–6 m of line per station and enough lateral space for two people to pass. Overhead rail height depends on species: cattle need roughly 3.6–4.2 m clear, sheep considerably less.
Chilling. Carcass chilling needs 0–4 °C with air movement and hanging space. Plan 0.8–1.2 m² per cattle carcass.
Cutting and packing. Separate room, positive pressure relative to the kill floor, temperature controlled to 10–12 °C or lower.
Waste and by-products. A separate external route. This is the most common design failure: waste has to be carried through clean areas because no back door was planned.
A mobile slaughtering trailer or container compresses the same flow into 6–12 m of length. What changes is the discipline: every station does double duty, and the chilling capacity usually sets the practical daily limit. When specifying a mobile unit, confirm:
Once the flow is drawn, the equipment list is mostly mechanical:
Draw the flow diagram before you draw the walls. If you are specifying a mobile slaughtering vehicle or container, send your species mix and heads per day, and we will map the layout onto the available length.